Slow and steady today backfilling. A load of fill was brought in and Marty, Kyle and Dave Black worked at getting things back to grade.

Early this morning Sam finished off breaking up the concrete slabs, did some prep work in the attic for Reitzel Insulation’s arrival Wednesday, and chipped in on moving the gravel around.
While waiting for Inspection 03 Foundation Pre-backfill, the Blacks checked some concrete levels with their laser beam and Sam loaded Marty’s bucket with the first slab of concrete.

