The Last Leg of Phase 1

Mother Nature cut us a break and a partial GJK Construction crew was able to finish the framing this morning. It was a frigid 6° but thankfully minimal rain.

Greg, Moe 2 and Doggie built the eaves above the west facing windows…

then the 2 Dave Bs and Kyle helped them tackle the last dormer. This machine gives new meaning to the word “BOOM!”

The dormer was in by 12:19 and the GJK team moved on to their next mission.

The Blacks helped Dave install the balance of the windows and they were on their way by 1:30.

FANtastic!