We are officially watertight. Finally!
Jordan and his crew returned to finish the aluminum.
Pat and Brock are completely finished laying all the stone!!! We are now just waiting on the final sill to go in. Should arrive this week. Yee haw!
Steve and Dave poured the pool house pad, built a frame for the pool cover and put up the safety fences to close off the area. The liner should arrive this week and the weather looks miraculously promising for the installation.
As for inside work, DK Custom Welding delivered the steel fireplace mantel which looks killer, and Dave installed the hardware for the French doors.
The 80 inch TV is going to look great over that fireplace