An insane amount of heavy machinery on site today. And loads of action.
Master + ensuite excavations
Footings formed
Gravel loaded
Wall forms were delivered and loaded
The REAL inspector checked the footings, then they were poured.
Did I mention OVER TOP OF THE HOUSE!
Joe on the truck, Steve on the remote control (dream job!), Mike and Matt in the pit.
Finally, the Doosan had finished its tour of duty – loaded by Dave Duncan, Kyle, Marty and Ed – and left the building.


What a day! Great toys. Where’s DB’s white helmet? What are the neighbors saying?
LikeLike
HA! The neighbours love it. The golfers? Not-so-much.
LikeLike