Slinging Stone

First, Marty graded the front to create a ramp for the gravel truck…

DirtRamp

..then it backed into position.

Mr. Trapp does not mess around. He went over the plan of attack with the sling operator…

…and in less than a hour, it was done.

This stone slinger did the work of 3 labourers toiling with shovels and wheelbarrows for a full day. Check it.

The inspector dropped by at 1:15, gave the thumbs up, and that’s all she wrote.

One thought on “Slinging Stone

Leave a comment