Friday June 10
Nephew Curtis was on site to help Dave demo the interior kitchen and mud room walls. Did I mention the concrete block?
Before & After
Also on site:
Chris Reitzel (favourite brother and Curtis’ dad) was here taking measurements and figuring out the game plan for the Reitzel Heating & Air Conditioning HVAC install.
Mike Parent from Cedar Roof Ontario came by to iron out some details as well.
Saturday June 11
Bill The Thrill was “chipping in” again helping Dave frame the back entrance and build the step up. Priceless.
BONUS: DB and I got the Brinkinator hooked up again after 2 months with no BBQ. Rib eyes for dinner – Yahoo Mountain Dew! (Yet another time capsule found inside the masonry. “Made from flavours specially blended in the traditional Hillbilly style”. Classic.)
Sunday June 12
Dave tackled the wiring in the west guest room. Pot lights, ceiling fixture, outlets, switches & dimmer. The attic working space was like a cocoon.
I think he needs a hair cut soon
LikeLike